The residential compound Gran Via Park features 11 buildings with different height regimens and an extensive green area in the vicinity of the Plaza Romania Mall. The construction of the first phase of the project was completed in Q4 2016, consisting of 2 buildings totaling 289 apartments, and in 2017 the construction of the second phase began, consisting of 2 buildings totaling 255 studios and apartments with 2, 3 and 4 rooms. The second phase will be finished in Q3 2018.
The complex is located at the intersection of two major streets in Bucharest: Timisoara Boulevard and Lujerului Boulevard.
There are multiple ways to quickly and easily get to both Drumul Taberei and Militari neighborhoods, as well as to the City Centre and outside of Bucharest.
The area has the largest concentration of shopping centers, malls, hypermarkets and supermarkets in the capital.
Plaza Romania Mall is at 3 minutes walking distance, Cora Lujerului at 5 minutes, AFI Cotroceni is also at 5 minutes distance by car. At 7 minutes distance is Auchan Drumul Taberei and at 10 minutes Orhideaa shopping center, which includes Carrefour hypermarket.
Structura Generala
Fatade Pereti Exteriori
Pereti interiori si tavane
Gips carton
Hidroizolatii
Pardoseli
Acoperisul este de tip terasa
Instalatii sanitare si canalizare
Ascensoare
Usi intrare apartament / usi interioare
Instalatii termice si de climatizare
Instalatii electrice